| Name Of Lots | Units | Amount |
|---|---|---|
| Lot 1: Region 1 - Jawa | 1270 | $5,310,902.00 |
| Lot 2: Region 2 - Sumatera and Kalimantan | 2118 | $8,857,079.00 |
| Lot 3: Region 3 - Sulawesi and East Indonesia | 2103 | $8,794,352.00 |
| No. | Date of Received | Question | Responses | Part (RFB) | Cluster | Sub Cluster |
|---|---|---|---|---|---|---|
| 1 | 2026-09-18 | In accordance with the Specific Procurement Notice, we kindly request the complete Bidding Documents for our review and participation in the procurement process. We would appreciate it if the Bidding Documents could be provided to us by email or directed to the appropriate link for downloading. |
Thank you for your inquiry regarding the Procurement of High Pressure Steam Sterilizer (Autoclave) (RFB Reference No.: ID-PMU SOPHI-560093-GO-RFB). For further questions and inquiries regarding the participation process, please visit our official website at https://kemkes.go.id/ihss/procurement/87448edf-2be1-493f-a608-f51b529d7f7c/ Thank you for your interest in participating. |
Bidding Procedure | Procurement Regulations | Forms |
| 2 | 2026-09-18 | we kindly request you to send us the Bidding document mentioned above in English, in order to evaluate the possibility of participation. | The bidding information and relevant documents for the Procurement of High Pressure Steam Sterilizer (Autoclave) can be accessed through the following link: https://kemkes.go.id/ihss/procurement/87448edf-2be1-493f-a608-f51b529d7f7c/ Thank you. |
Bidding Procedure | Procurement Regulations | Forms |
| 3 | 2026-09-18 | In response to your above-mentioned ITB Notification, We, wish to participate in the BID No. ID-PMU SOPHI-560093-GO-RFB for "Procurement of High Pressure Steam Sterilizer (Autoclave)". Kindly requested to share the Tender Documents of the above RFB. |
The bidding information and relevant documents for the Procurement of High Pressure Steam Sterilizer (Autoclave) can be accessed through the following link: https://kemkes.go.id/ihss/procurement/87448edf-2be1-493f-a608-f51b529d7f7c/ Thank you. |
Bidding Procedure | Procurement Regulations | Forms |
| 4 | 2026-09-21 | Following your Specific Procurement Notice published on the WB site, we express our interest in supply and delivery of High Pressure Steam Sterilizer (Autoclave) and kindly ask you to provide the full set of bidding documents. | Thank you for your inquiry regarding the Procurement of High Pressure Steam Sterilizer (Autoclave) (RFB Reference No.: ID-PMU SOPHI-560093-GO-RFB). For further questions and inquiries regarding the participation process, please visit our official website at https://kemkes.go.id/ihss/procurement/87448edf-2be1-493f-a608-f51b529d7f7c/ Thank you for your interest in participating. |
Bidding Procedure | Procurement Regulations | Forms |
| 5 | 2026-09-23 | We have seen the referenced procurement notice you have published on the World Bank Website and wish to register our interest in participating and to request a copy of the both tender documents | The bidding information and relevant documents for the Procurement of High Pressure Steam Sterilizer (Autoclave) can be accessed through the following link: https://kemkes.go.id/ihss/procurement/87448edf-2be1-493f-a608-f51b529d7f7c/ Thank you. |
Bidding Procedure | Procurement Regulations | Forms |
| 6 | 2026-10-01 | 1. If a feature is available in the offered model but is not specifically stated in the catalogue/manual, will a manufacturer-issued declaration or technical datasheet be accepted as documentary evidence for awarding the applicable rated score? 2. For a bidder offering equipment manufactured by a principal/manufacturer, can the required manufacturing experience and production capacity be demonstrated by the manufacturer through the Manufacturer’s Authorization and supporting documents, rather than by the bidder itself? 3. As the Bid Price may be quoted in two currencies, USD and IDR, could you please confirm whether payment will also be made in the respective currencies? 4. For the similar contract experience requirement, will contracts involving various types of medical equipment or other health-sector goods be considered? |
1. A manufacturer-issued declaration or technical datasheet may be accepted as documentary evidence, provided that the document is issued by the manufacturer and adequately demonstrates that the offered model meets the relevant technical requirement. 2. Yes, the required manufacturing experience and production capacity may be demonstrated by the manufacturer/principal, subject to the applicable requirements and supporting documents stipulated in the bidding document. The financial capability (AATO) and specific experience of a manufacturer can be cited (submitted with a bid) only if the manufacturer also participates as a Bidder (e.g., as a member of a JV). The production year and annual production capacity can be cited by the manufacturer itself (when participating as a Bidder), or by another firm that is not a manufacturer but participates as a Bidder. In the latter case, that Bidder shall provide a manufacturer’s authorization, including the information on the production year and annual production capacity verified by the manufacturer. 3. Yes. If the Bid Price is offered in two currencies, namely USD and IDR, payment will be made in the respective currencies according to the currencies offered in the Bid Price. 4. Many thanks for the question. For the purposes of the current tender, contract experience involving any type of sterilization equipment will be considered relevant for the similar contract experience requirement. This may include, but is not limited to, autoclaves, steam sterilizers, ethylene oxide (EtO) sterilizers, dry-heat sterilizers, and comparable sterilization systems. |
Supply Requirements | Evaluation Process | Qualification Requirements |
| 7 | 2026-10-01 | PT. Sigma Andalan Nusa (SHINVA) 1. Regarding the technical specifications, our proposed machine is equipped with both vacuum and gravity sterilization systems. However, the price of the proposed machine is slightly higher. May we still offer the machine in accordance with the required specifications? 2. Is a Joint Operation (KSO) with the principal/manufacturer allowed for this procurement? 3. For the requirements related to Specific Experience, Production Capacity, and Average Annual Turnover (AATO), can the experience, production capacity, and financial capacity of the principal/manufacturer be used to fulfill the requirements? Can these requirements be fulfilled jointly by the bidder and the principal/manufacturer? 4. Regarding the technical specifications, is compliance with the requirements highlighted in green mandatory? For the requirements highlighted in orange, would failure to comply result in disqualification? |
1. Many thanks for the question. As defined in the technical specifications, bidders are required to offer a High Pressure Steam Sterilizer (Autoclave) capable of performing both gravity and vacuum/pre-vacuum sterilization cycles. Bids offering only one of these cycle types will be considered non-compliant with the mandatory requirements and will be rejected. Bidders are, however, free to propose any price they consider appropriate and reasonable for providing equipment that meets these requirements. The proposed price will subsequently form part of the financial evaluation of the bid in accordance with the bidding document. 2. Yes. A Joint Operation (KSO) with the principal/manufacturer is permitted (in the form of a Joint Venture as further defined in the Bidding Document), subject to the requirements and conditions stipulated in the Bidding Document. 3. Yes. The required Specific Experience and Production Capacity may be fulfilled by either the Lead Member or the Member, or jointly by both, as applicable, in accordance with the applicable provisions for the KSO. The specific experience of a manufacturer may be considered only if the manufacturer also participates as a Bidder, including as a member of a Joint Venture (JV). The production year and annual production capacity may be demonstrated by the manufacturer itself when participating as a Bidder, or by another firm participating as a Bidder. If the Bidder is not the manufacturer, the Bidder shall provide authorization from the manufacturer, including information on the production year and annual production capacity, duly verified by the manufacturer. 4. Requirements highlighted in green are mandatory. Failure to meet any mandatory requirement will result in the disqualification of the bid. Requirements highlighted in orange are rated requirements and are not mandatory. Bidders may choose whether to offer any or all of them. Failure to meet a rated requirement will not result in disqualification, but the corresponding rated score will not be awarded. |
Supply Requirements | Evaluation Process | Qualification Requirements |
| 8 | 2026-10-01 | 1. If a bidder does not meet the past experience requirement of supplying 340 units in a previous year, can a Joint Venture (JV) with a manufacturer that has the required experience be used to fulfill the requirement? 2. Could you please clarify the 40% and 20% JV requirements? 3. Regarding the certification requirement, can a Manufacturer’s Declaration of Conformity (DoC) issued by the manufacturer be accepted as an alternative to CE MDR? |
1. Yes. The required specific experience may be fulfilled by the JV members collectively, as their experience may complement each other. However, if both the Lead Member and the Member meet the requirement of supplying 340 units, this is also acceptable. Please note that the bidder is required to demonstrate the required supply quantity within one year during the last seven years. The quantity cannot be accumulated over multiple years within the seven-year period. 2. The 40% and 20% requirements apply only to the AATO requirement and do not apply to the Specific Experience requirement. For the AATO requirement, the Lead Member shall meet at least 40% of the required AATO, while the Member shall meet at least 20%. Please note that meeting at least 40% and 20% of the minimum AATO requirement does not mean that a combined (total) 60% of the minimum AATO requirement will be eventually accepted. The Bidder (as a JV) shall continue to meet 100% of the minimum AATO requirement jointly. Therefore, the Bidder shall carefully assess its financial capacity and ensure that it meets 100% of the minimum AATO requirement. 3. Many thanks for the question. As stipulated in the technical specification, bidders must either provide an Indonesian Product Approval License (Nomor Izin Edar (NIE)) or submit valid evidence of compliance with an internationally recognized regulatory standard, such as U.S. FDA clearance, CE Mark certification under EU MDR 2017/745, or an equivalent health, safety, and environmental regulatory approval. In the latter case, acceptable evidence would typically consist of a valid conformity assessment certificate issued by an authorized Notified Body, as applicable to the device classification. A Declaration of Conformity (DoC) or Pressure Equipment Directive (PED) documentation alone would not be considered sufficient evidence of compliance for this device type. |
Supply Requirements | Evaluation Process | Technical Evaluation |
| 9 | 2026-10-01 | Haris, PT Surgika Alkesindo 1. Row 26 – Sterilization Process Modes The specification requires the autoclave to support both: Gravity cycle: ≥121°C; and Vacuum cycle: ≥132°C. Please clarify whether the autoclave is required to operate using the vacuum cycle or the gravity cycle. If the vacuum cycle is used, would the gravity cycle still be required/available? 2. Row 57 – Bowie & Dick Test Paper The specification requires the Bidder to supply a starter kit sufficient for 100 typical autoclave cycles. However, the Bowie & Dick test is generally applicable to pre-vacuum steam sterilizers and is not intended for gravity cycles. Please clarify whether the Bowie & Dick test is required when the autoclave is operated in vacuum/pre-vacuum mode. 3. Rows 55, 56, and 57 – Chemical Indicator Strips, Chemical Indicator Tape, and Bowie & Dick Test Paper Please clarify the requirement to supply a starter kit in a quantity required for 100 typical autoclave cycles. Does this mean that the bidder is required to provide consumables sufficient for 100 cycles, regardless of the frequency of actual use? For example, if the autoclave is operated only once per day, would the requirement still be based on 100 cycles? 4. Row 57 – Bowie & Dick Test Paper Can the required Bowie & Dick test paper be replaced with an equivalent Bowie & Dick test card or strip, provided that it performs the same function and complies with the applicable requirements? 5. Proposed Consumables – Biological Indicator The Proposed Consumables sheet includes a requirement for a biological indicator; however, no corresponding requirement appears in the technical specifications. Please clarify whether the bidder is required to additionally supply the biological indicator, and if so, what quantity is required. |
1. Row 26 – Sterilization Process Modes The specification requires the autoclave to support both: Gravity cycle: ≥121°C; and Vacuum cycle: ≥132°C. The specification is maintained. The autoclave shall support both sterilization modes, namely: Gravity cycle at ≥121°C; and Vacuum/pre-vacuum cycle at ≥132°C. Both modes shall be available and selectable depending on the type of load and sterilization requirements. Therefore, the availability of the vacuum cycle does not replace the requirement for the gravity cycle. 2. Row 57 – Bowie & Dick Test Paper Yes. The Bowie & Dick test is intended for testing the air-removal performance of the vacuum/pre-vacuum cycle. It is not required for a gravity-only cycle. Since the specified autoclave is required to provide a vacuum/pre-vacuum mode, the Bowie & Dick test requirement remains applicable. 3. Rows 55, 56, and 57 – Chemical Indicator Strips, Chemical Indicator Tape, and Bowie & Dick Test Paper Many thanks for the question. As described in the technical specification, bidders are required to specify and supply the relevant consumables needed to perform a defined number of sterilization cycles, which in this case is 100 cycles. While the actual period over which these consumables are used may vary depending on facility utilization, bidder compliance is assessed solely against the required number of cycles, not the duration of use. For clarity, MoH will revise the requirement from "100 typical autoclave cycles" to "100 typical vacuum/pre-vacuum sterilization cycles" in a forthcoming amendment. 4. Row 57 – Bowie & Dick Test Paper An equivalent Bowie & Dick test card, strip, test pack, or other equivalent air-removal test device may be accepted, provided that it performs the same intended function, is suitable for the proposed vacuum/pre-vacuum steam sterilizer, and complies with the applicable standards and manufacturer's recommendations. The bidder shall provide supporting technical documentation demonstrating equivalency. 5. Proposed Consumables – Biological Indicator Yes. The Biological Indicator listed in the Proposed Consumables sheet is required. The bidder shall specify the quantity required to support the equivalent of 100 typical autoclave cycles, taking into account the recommended frequency of biological monitoring according to applicable standards and/or the manufacturer's recommendations. The Biological Indicator shall be suitable for monitoring steam sterilization using the proposed sterilizer. |
Supply Requirements | Evaluation Process | Technical Evaluation |
| 10 | 2026-10-01 | Regarding Technical Specification Row 58 – Other Proprietary Consumable (if any), which is highlighted in green, if the bidder has or does not have any other proprietary consumables, should the bidder indicate “Yes” or “No” in the compliance column? | Many thanks for the question. Upon further review and consideration, the MoH has decided to revise this requirement in a forthcoming amendment to clarify that, if no additional proprietary accessories are required for the proposed device, bidders must: (i) indicate "No" in Column E; and (ii) clearly state in Column F that the offered device does not require any additional proprietary accessories for its intended operation and full functionality. Bidders will not be rejected if they indicate "No" in Column E and provide the corresponding explanation in Column F. |
Supply Requirements | Evaluation Process | Technical Evaluation |
| 11 | 2026-10-01 | For domestically produced products (Produksi Dalam Negeri), will they be given priority in this procurement? | Domestic products will be considered in accordance with the Domestic Preference provisions specified in the bidding document, and the applicable domestic preference will be applied during bid evaluation subject to the requirements and conditions set forth therein. No priority is given to domestic products as such; however, a margin of domestic preference may be applied under the situation specified in the Bidding Document. Bidders are kindly requested to refer to the relevant provision in the Bidding Document. | Supply Requirements | Evaluation Process | Qualification Requirements |
| 12 | 2026-10-01 | Will the minimum production requirement be taken into consideration? | Yes. The minimum production requirement will be taken into consideration in accordance with the requirements stipulated in the bidding document, as it serves as evidence of the bidder's capacity and capability to fulfill the contract requirements | Supply Requirements | Evaluation Process | Specific Experience |
| 13 | 2026-10-06 | Regarding the ongoing tender process, we would like to kindly request clarification on several technical requirements stated in the tender document. The clarification is required to ensure that our proposed solution fully complies with the intended operational and technical requirements. Please find our clarification points below: 1. Row No. 26 – Sterilization Process Modes The specification states that the autoclave must support the following sterilization processes and minimum operating temperatures: Gravity cycle: ≥121°C Vacuum cycle: ≥132°C Could you please confirm whether the required unit classification is intended to be a Class B autoclave or a Class S autoclave? We would like to clarify this point as both classifications may have different capabilities and configurations. The mention of both gravity and vacuum cycles may lead to different interpretations regarding the intended autoclave classification. Kindly confirm whether the requirement is based on a specific autoclave class or based on the required sterilization performance and cycle capability. 2. Row No. 57 – Bowie & Dick Test Paper The specification states that: "Bidder to supply a starter kit in a quantity required for 100 typical autoclave cycles." Could you please confirm whether the Bowie & Dick Test may be provided in either pack format or cartridge/cart format, provided that it meets the required performance standards and supports the required number of test cycles? We would appreciate your confirmation on whether both formats will be accepted under this tender requirement. 3. Row No. 3 – Biological Indicators Regarding the Biological Indicators requirement listed under the proposed consumables, we would like to request further clarification. Could you please confirm whether the supply of Biological Indicators is a mandatory requirement as part of this tender scope? Furthermore, we would like to highlight that the use of Biological Indicators generally requires additional supporting equipment, such as a biological indicator reader or incubator, for result processing and interpretation. These additional devices may represent a significant investment and may affect the overall proposed solution. Therefore, we would appreciate your clarification on the following points: Is the provision of Biological Indicators mandatory for this tender? If Biological Indicators are required, should the bidder also include the required reader/incubator equipment? Alternatively, can Biological Indicators be accepted if the hospital already has existing facilities for incubation and result interpretation? Your clarification on these points will help us prepare the most appropriate proposal and ensure alignment with the tender requirements. |
1. Row 26 – Sterilization Process Modes The specification requires the autoclave to support both: Gravity cycle: ≥121°C; and Vacuum cycle: ≥132°C. The specification is maintained. The autoclave shall support both sterilization modes, namely: Gravity cycle at ≥121°C; and Vacuum/pre-vacuum cycle at ≥132°C. Both modes shall be available and selectable depending on the type of load and sterilization requirements. Therefore, the availability of the vacuum cycle does not replace the requirement for the gravity cycle. MoH moreover confirms that the offered device must be capable of performing both gravity and vacuum/pre-vacuum sterilization cycles. Bids offering only one of these cycle types will be considered non-compliant with the mandatory requirements and will be rejected. 2. Row 57 – Bowie & Dick Test Paper Yes. The Bowie & Dick test is intended for testing the air-removal performance of the vacuum/pre-vacuum cycle. It is not required for a gravity-only cycle. Since the specified autoclave is required to provide a vacuum/pre-vacuum mode, the Bowie & Dick test requirement remains applicable. The requirement refers to consumables sufficient to support 100 typical autoclave cycles as a standardized basis for the starter kit, regardless of how frequently the sterilizer is operated per day. The quantity of each consumable shall take into account its normal/recommended frequency of use. Therefore, it does not necessarily mean that every type of consumable must be used once in every sterilization cycle. The bidder shall specify the corresponding unit quantity in the Proposed Consumables sheet. (Please refer to the answer provided in Row 1.) 3. Biological Indicator - Under the Consumables column, bidders are required to offer chemical indicator strips/tape and Bowie-Dick test paper. - Under Other Proprietary Consumables Required for Full Functionality of the Device (if any), bidders must specify any additional proprietary consumables necessary for the full functionality of the device. If no additional proprietary consumables are required, bidders must indicate “N/A.” |
Supply Requirements | Evaluation Process | Technical Evaluation |
| 14 | 2026-10-12 | We kindly request your official clarification on the following technical and qualification requirements: 1. Regulatory Compliance (Row 6): If an Indonesian Product Approval License (NIE) is not available, would a PED 2014/68/EU certificate or a Manufacturer’s Declaration of Conformity be accepted as interim evidence before contract signing, or is specific medical device approval, such as EU MDR 2017/745 or US FDA clearance, mandatory? 2. Electrical Safety Standard (Row 71): Would compliance with EN 61010, supported by a valid CE test report, be accepted as equivalent to IEC 61010 without a separate IEC certificate? 3. Past Contract Experience: If the Lead Bidder does not meet the cumulative annual requirement of 381 units based on contracts executed within the last seven years, would forming a Joint Venture (JV) with the manufacturer be permitted to combine relevant experience and fulfill this requirement? 4. Delivery Locations: Kindly confirm the exact delivery address(es) to enable us to accurately calculate freight and local service charges. |
1. Many thanks for the question. As stipulated in the Technical Specifications, bidders must provide the Indonesian Product Approval License (Nomor Izin Edar (NIE)) or valid evidence of compliance with an internationally recognized regulatory standard, such as U.S. FDA clearance, CE Mark certification under EU MDR 2017/745, or an equivalent health, safety, and environmental regulatory approval. The absence of an NIE at the time of bid submission shall not be a basis for rejection, and successful bidders will be offered an accelerated track for NIE registration before contract signing. In the latter case, acceptable evidence would typically consist of a valid conformity assessment certificate issued by an authorized Notified Body, as applicable to the device classification. A Declaration of Conformity (DoC) or Pressure Equipment Directive (PED) documentation alone would not be considered sufficient evidence of compliance for this device type. 2. Many thanks for the question. As specified in the Technical Specifications, bidders must demonstrate that the offered device complies with IEC 61010, substantiated by a valid certificate or test report issued by an accredited testing laboratory. Other authoritative standards that ensure substantial equivalence to the specified standard are acceptable (Section VII, Technical Specifications, Standards). A separate IEC certificate is not required, provided the test report demonstrates compliance with the requirements of IEC 61010. 3. Yes. A bidder may form a Joint Venture (JV) with another firm, including the manufacturer, to enhance its qualification. Pursuant to Section III (Evaluation and Qualification Criteria), 1(b) Specific Experience, for a JV this requirement may be met by all members combined. Please note that the JV shall consist of a maximum of three (3) members (BDS ITB 4.1), the Bid shall include a copy of the JV Agreement or Letter of Intent, and the Lead Partner and each partner must also meet at least 40% and 20% of the total AATO requirement respectively. 4. Bidders are kindly requested to refer to Annex 1 – Final Destination (list of final destinations/locus sheet), Section VII (Schedule of Requirements), List of Goods and Delivery Schedule, and List of Related Services and Completion Schedule. Please note that these are expected schedules, subject to the completion of the procurement process and the award decision. |
Supply Requirements | Evaluation Process | Technical Evaluation |
| 15 | 2026-10-13 | 1. Regulatory Compliance (Row 6): If an Indonesian Product Approval License (NIE) is not yet available, will a voluntary Pressure Equipment Directive certificate (PED 2014/68/EU) or a Manufacturer’s Declaration of Conformity be accepted as valid evidence prior to contract signing, or is a dedicated Medical Device approval (e.g., EU MDR 2017/745 or US FDA) strictly required? 2. Electrical Safety Standard (Row 71): Will compliance with EN 61010 (supported by a valid CE Test Report) be accepted as equivalent to IEC 61010, without a standalone IEC certificate? 3. Past Contract Experience: If the Lead Bidder's experience within the last 7 years falls short of the cumulative 381 units annually, is it permissible to form a Joint Venture (JV) with the Manufacturer to combine experience and fulfill this requirement? |
1. Many thanks for the question. As stipulated in the Technical Specifications, bidders must provide the Indonesian Product Approval License (Nomor Izin Edar (NIE)) or valid evidence of compliance with an internationally recognized regulatory standard, such as U.S. FDA clearance, CE Mark certification under EU MDR 2017/745, or an equivalent health, safety, and environmental regulatory approval. The absence of an NIE at the time of bid submission shall not be a basis for rejection, and successful bidders will be offered an accelerated track for NIE registration before contract signing. In the latter case, acceptable evidence would typically consist of a valid conformity assessment certificate issued by an authorized Notified Body, as applicable to the device classification. A Declaration of Conformity (DoC) or Pressure Equipment Directive (PED) documentation alone would not be considered sufficient evidence of compliance for this device type. 2. Many thanks for the question. As specified in the Technical Specifications, bidders must demonstrate that the offered device complies with IEC 61010, substantiated by a valid certificate or test report issued by an accredited testing laboratory. Other authoritative standards that ensure substantial equivalence to the specified standard are acceptable (Section VII, Technical Specifications, Standards). A separate IEC certificate is not required, provided the test report demonstrates compliance with the requirements of IEC 61010. 3. Yes. A bidder may form a Joint Venture (JV) with another firm, including the manufacturer, to enhance its qualification. Pursuant to Section III (Evaluation and Qualification Criteria), 1(b) Specific Experience, for a JV this requirement may be met by all members combined. Please note that the JV shall consist of a maximum of three (3) members (BDS ITB 4.1), the Bid shall include a copy of the JV Agreement or Letter of Intent, and the Lead Partner and each partner must also meet at least 40% and 20% of the total AATO requirement respectively. |
Supply Requirements | Evaluation Process | Technical Evaluation |
| 16 | 2026-10-16 | With reference to the tender for the Procurement of High Pressure Steam Sterilizer (Autoclave), we kindly request your clarification on the following technical specifications: 1. Chamber Volume We assume that any bidder offering an autoclave with a chamber volume ranging from 24 litres to 50 litres will fully meet the required technical specifications. Further, we understand that the technical score will be awarded proportionately based on the chamber volume offered by different bidders. Kindly confirm whether our understanding is correct. 2. Water Reservoir Capacity We assume that any bidder offering an autoclave with a water reservoir capacity ranging from 3 litres to 5 litres will fully meet the required technical specifications. Further, we understand that the technical score will be awarded proportionately based on the water reservoir capacity offered by different bidders. Kindly confirm whether our understanding is correct. |
1. Chamber Volume (rows 16 and 17, as per col. A) Many thanks for the question. As stipulated in the technical specifications, bidders are required to provide a High Pressure Steam Sterilizer (Autoclave) with a chamber volume of at least 24 liters (≥ 24 L). In addition, bidders offering an autoclave with a chamber volume of at least 50 liters (≥ 50 L) will be awarded 5 points. Accordingly: (i) Bidders offering a chamber volume of less than 24 L will not meet the mandatory requirement and their bid will be considered non-responsive; (ii) Bidders offering a chamber volume of 24 L to less than 50 L will meet the mandatory requirement, but will not receive any points under the rated criterion; and (iii) Bidders offering a chamber volume of 50 L or greater will meet the mandatory requirement and receive the full 5 points under the rated criterion. No partial points will be awarded. 2. Water Reservoir Capacity (rows 31 and 32, as per col. A) Many thanks for the question. As stipulated in the technical specifications, bidders are required to provide a High Pressure Steam Sterilizer (Autoclave) with a water reservoir capacity of at least 3 liters (≥ 3 L). In addition, bidders offering an autoclave with a water reservoir capacity of at least 5 liters (≥ 5 L) will be awarded 3 points. Accordingly: (i) Bidders offering a water reservoir capacity of less than 3 L will not meet the mandatory requirement and their bid will be considered non-responsive; (ii) Bidders offering a water reservoir capacity of 3 L to less than 5 L will meet the mandatory requirement, but will not receive any points under the rated criterion; and (iii) Bidders offering a water reservoir capacity of 5 L or greater will meet the mandatory requirement and receive the full 3 points under the rated criterion. No partial points will be awarded. |
Supply Requirements | Evaluation Process | Technical Evaluation |
| 17 | 2026-10-16 | After reviewing the tender document, we kindly request your clarification on the following points to ensure that our bid is prepared in full compliance with the tender requirements. 1. Local Indonesian Agent As the bidding is open to foreign bidders, kindly confirm whether a foreign bidder is required to nominate and declare an Indonesian local agent at the time of bid submission, or whether the appointment of an Indonesian agent may be made after contract award. If an Indonesian agent is required at the time of bid submission, kindly clarify the minimum registration, licensing, and qualification requirements applicable to such local agents. 2. Import Duties and Local Taxes Please clarify whether a foreign bidder is exempted from import duties and local taxes under this Procurement. If such duties and taxes are not exempted, kindly specify the applicable rates/percentages of import duties, VAT, local taxes, and any other applicable taxes or charges, the foreign bidder is required to consider in its bid price. 3. Currency – USD / IDR Please confirm whether a foreign bidder may quote the international supply component in USD and the Indonesian local services/component in IDR, in accordance with the applicable price schedule. Further, kindly confirm whether USD will be accepted as the foreign currency for payment to the foreign bidder for the international supply component. 4. Installation, Commissioning, Testing and Training all 5,491 final-destination sites.Please confirm whether installation, commissioning, testing and user training are required at Please confirm whether installation, commissioning, testing and user training are required at all 5,491 final-destination sites. Further, kindly clarify whether the Purchaser will ensure that the respective sites are ready and accessible for installation and commissioning as per the agreed delivery and implementation schedule. 5. Documentary Evidence for Rated Technical Features Kindly clarify whether, in cases where a particular feature is available in the offered model but is not explicitly mentioned in the product catalogue or user manual, a manufacturer-issued declaration or an official technical datasheet confirming the availability of that feature will be accepted as documentary evidence for awarding the applicable technical score. 6. Manufacturer's Experience and Production Capacity For a bidder offering equipment manufactured by another company, kindly confirm whether the required manufacturing experience and production capacity may be demonstrated through the manufacturer's credentials and supporting documents, along with the Manufacturer's Authorization, rather than being required from the bidder itself. 7. Warranty and Comprehensive Operation and Maintenance (O&M) Options Kindly confirm whether bidders may choose either of the following options: Option 1: A 5-year warranty. Option 2: A 7-year warranty, including comprehensive operation and maintenance (O&M) services. Furthermore, please clarify whether the additional two years of warranty and the comprehensive O&M services under Option 2 will be considered in the financial evaluation and, if so, how the associated costs will be assessed against the 5-year warranty option. 8. Request for Extension of the Bid Submission Deadline Considering the above clarification requests and the time required to review the requirements and prepare a comprehensive and fully compliant technical and commercial bid, we kindly request the to extend the bid submission deadline by 10–15 calendar days. The requested extension would provide sufficient time to review the clarifications, incorporate your responses into their bids, and submit complete and competitive offers in accordance with the tender requirements. 9. Request for Pre-Bid Meeting Minutes With reference to the pre-bid meeting held on 1 October 2026 for the above-mentioned tender, we kindly request you to share the minutes of the pre-bid meeting, including the clarifications, responses, and decisions recorded during the meeting, for our reference and to ensure that our bid is prepared in accordance with the requirements. |
1. Local Indonesian Agent Many thanks for the question. There is no requirement for a foreign Bidder to nominate or declare an Indonesian local agent for the purpose of bid submission. Please refer to ITB 17.2 and BDS ITB 17.2, which require a Manufacturer’s Authorization and after-sales service in accordance with the Technical Specifications, but do not require the appointment of a local agent at the time of bid submission. 2. Import Duties and Local Taxes Many thanks for the question. Pursuant to ITB 14.8(b), for goods manufactured outside Indonesia, the Bidder shall quote the price on a DDP basis, including the customs duties and other import taxes to be paid on the Goods. Under GCC 17.1, the Supplier is responsible for taxes and duties imposed outside Indonesia. Under GCC 17.3, the Purchaser shall use its best efforts to enable the Supplier to benefit from any tax exemptions or privileges available in Indonesia. Please note that the price evaluation (ITB 38.1) excludes customs duties and taxes. Bidders are kindly requested to refer to the prevailing regulations on tax and customs facilities for Government projects financed by foreign loans/grants, namely Minister of Finance Regulation (PMK) No. 80 of 2024 (https://jdih.kemenkeu.go.id/dok/pmk-80-tahun-2024), regarding VAT/VAT and Luxury Goods Sales Tax and Income Tax facilities, and PMK No. 109 of 2024 (https://peraturan.bpk.go.id/Details/311484) , regarding import duty exemption. The applicable rates and the availability of such facilities shall be as stipulated in those regulations. 3. Currency – USD / IDR Many thanks for the question. Yes. Pursuant to ITB 15.1 and BDS ITB 15.1, the Bidder is required to quote in Indonesian Rupiah the portion of the Bid price that corresponds to expenditures incurred in Indonesia, and may quote the remaining (international) portion in a foreign currency, including USD, in accordance with the applicable Price Schedule. In accordance with ITB 15.1, the currency(ies) of payment shall be the same as the currency(ies) of the Bid. Therefore, payment of the international supply component will be made in the currency offered in the Bid (e.g., USD). 4. Installation, Commissioning, Testing and Training (5,491 sites) Many thanks for the question. Yes. Installation, testing, and commissioning are required at each final destination (Project Site) for every unit, as stated in the List of Related Services and Completion Schedule (Section VII), and the Bidder must perform in-person Acceptance Testing and Commissioning in the presence of the MoH Representative. User training of a minimum of two (2) sessions is also required (the first in person at each facility within two weeks of Acceptance; the second may be held online), as specified in Section VII, Technical Specifications. The vendor representative must attend the respective site (Annex 1 – Final Destination). With regard to site readiness, MoH will track the readiness of facilities (equipment availability, human resource capacity, infrastructure and utilities, and medical waste management) and will provide the Supplier with written advance notice of the locations that meet all readiness criteria before delivery. Inspection, testing, and commissioning are to be completed within 210 days from the date the written list of ready facilities is provided by MoH (Section VII, Schedule of Requirements). Facilities not yet ready will be included in subsequent deliveries. 5. Documentary Evidence for Rated Technical Features Many thanks for the question. A manufacturer-issued declaration or technical datasheet may be accepted as documentary evidence, provided that the document is issued by the manufacturer and adequately demonstrates that the offered model meets the relevant technical requirement. The Purchaser may still request further clarification to ensure that the document is consistent with the offered technical specifications (ITB 27). 6. Manufacturer’s Experience and Production Capacity Many thanks for the question. Yes. Pursuant to Section III (Evaluation and Qualification Criteria), 1(d) and 1(e), a Bidder that does not manufacture the offered Goods shall provide a Manufacturer’s Authorization (BDS ITB 17.2(a)), and the manufacturing experience and production capacity criteria shall be met by the authorizing manufacturer. The Bidder itself is not required to meet them. Please note that the manufacturer’s documentary evidence must show manufacturing experience of at least four (4) years (2022–2025) and annual production capacity of at least 50% of the quantities specified under each lot in each of those four years. The Bidder must still meet the Financial Capability (AATO) and Specific Experience requirements, individually or as a JV. 7. Warranty and Comprehensive O&M Options Many thanks for the question. Yes, bidders may choose Option 1 (5-year warranty) or Option 2 (7-year warranty including comprehensive O&M), as specified in Section VII (List of Related Services and Completion Schedule). Bidders who select the 7-year option will receive additional points in the evaluation. In both options, the Bidder shall provide the Warranty and Comprehensive Operations and Maintenance, inclusive of annual preventive maintenance and repair services, inclusive of all labor, parts, logistics, and transportation, and inclusive of all supplied items provided in the offer (Section VII, Technical Specifications, Items 17 and 18). If the Bidder offers the extended warranty period, the cost of the 2-year extended comprehensive O&M and warranty shall be deemed included in the price of the mandatory 5-year comprehensive O&M and warranty period. No additional cost shall be permitted to cover the 2-year extended period. Please refer to the relevant line item in the Price Schedule for Related Services, where the Bidder is required to quote the cost of the Warranty and Comprehensive Operations and Maintenance Contract Duration (1–5 years) or (1–7 years). 8. Request for Extension of Bid Submission Deadline Many thanks for the request. The Purchaser has considered the request and will extend the deadline for the submission of Bids. The extension will be formalized through an Addendum pursuant to ITB 8 and ITB 22.2. 9. Request for Pre-Bid Meeting Minutes Many thanks for the request. The minutes of the pre-bid meeting held on 1 October 2026 have been published on the IHSS website at https://kemkes.go.id/ihss/procurement/87448edf-2be1-493f-a608-f51b529d7f7c/ (under “Documentation”). Bidders are kindly requested to refer to the published minutes. Any modification to the Bidding Documents resulting from the pre-bid meeting will be made exclusively through an Addendum (ITB 8). |
Supply Requirements | Evaluation Process | Qualification Requirements |
| 18 | 2026-10-16 | Point 76 in the bid requirement: Interface with Information System- Capable of interfacing with hospital or health information systems (e.g., HIS, RIS, LIS, EMR). For the HIS requirement, if the output is via HL7, a standard HIS protocol is good enough? Otherwise, kindly provide further information about the HIS. |
This autoclave is intended for use in primary healthcare facilities (Puskesmas); therefore, the use of HL7 is considered sufficient for the needs of these facilities. | Supply Requirements | Evaluation Process | Technical Evaluation |
No contract award notice uploaded for this lot.
No contract award notice uploaded for this lot.
No contract award notice uploaded for this lot.